Planning your extension
Every extension starts with what you need the space for. A kitchen-diner, a downstairs bedroom, a utility and WC, or a larger living area all lead to different layouts, window positions and services. From there, the design has to work with your house: the roof shape, the existing walls and openings, drainage, neighbours' windows and the garden.
Planning permission
Many single-storey extensions can be built under permitted development, without a planning application. According to the Planning Portal, a single-storey rear extension can extend up to 4m from the rear wall of a detached house or 3m for other houses, with a maximum height of 4m, and the eaves are limited to 3m where the extension is within 2m of a boundary. Larger single-storey rear extensions may be possible through the prior approval process.
Two-storey extensions have tighter limits, and side extensions of more than one storey always need planning permission. Planning conditions, Article 4 Directions and conservation areas can also remove or restrict permitted development, so it's worth checking with Tamworth Borough Council early. If you want certainty, a Lawful Development Certificate confirms that your plans are permitted development.
Building regulations
Almost every extension needs building regulations approval, whether or not planning permission is required. Building regulations cover the foundations and structure, fire safety, insulation and energy efficiency, ventilation, drainage and electrical safety. Building control inspects key stages, such as the foundation excavations and drainage, and issues a completion certificate at the end. You'll need that certificate when you sell the house.
The Party Wall Act
If your extension involves building on or near the boundary with a neighbour, such as digging foundations close to their house or cutting into a shared wall, the Party Wall etc. Act 1996 may apply. It requires you to serve notice on your neighbour before the work starts, and in some cases a party wall surveyor needs to be appointed. Planning permission doesn't remove this obligation, so it should be dealt with early.
How an extension build runs
Once approvals are in place, the work typically follows a clear sequence: groundworks and foundations, drainage, the walls up to roof level, the roof structure and covering, then windows and doors to make the building weathertight. After that comes the first fix of electrics and plumbing, insulation and plastering, the second fix, and finally the opening-up into the existing house, which is usually left as late as possible to keep disruption down.
Roofing your extension
The roof is where extensions most often go wrong, especially at the junction with the existing house. Flat roofs need the right falls, upstands and edge details; pitched roofs need to tie in neatly with existing tiles and leadwork. As roofers, we treat the roof as a core part of the job rather than a finishing trade.
Windows, doors and finishing
Windows and doors in an extension need to meet building regulations for energy efficiency and, in some positions, safety glazing and fire escape requirements. Internally, the extension is insulated, plastered and finished to match the rest of the house, with floor levels aligned so the transition from old to new feels seamless.